Our dedication to delivering top-tier engineering solutions has established us as one of Malaysia’s most trusted and capable construction teams. With a total contract value surpassing 300 million MYR, we are honored to be recognized by our clients as a reliable partner in building their dreams.

Our Esteemed Clients and Projects:

SH1

CCCC EARTHWORK

Project Details: Construction of Subgrade Works, Drainage Works and Culvert Works from CH447+000-CH458+000
Project Location: Lanchang, Pahang
Client: CCCC
Project Status: 28/7/2023 ~ ongoing

CCCC BASE CAMP

Project Details: Land area 34000 m², 65 Blocks, construction is inclusive of earthwork, building work, landscape, carpark, etc.
Project Location: Bentong, Pahang
Client: CCCC
Project Status: 15/3/2022 ~ ongoing

CCCC Kuantan Port City Earthwork

Project Details: The Construction and Completion of Subgrade Earthwork for Kuantan Port City Station from CH301+040 to CH301+825 
Project Location: Kuantan, Pahang
Client: CCCC
Project Status: 15/06/2022 ~ ongoing

CCCC KT Station Structural Works

Project Details: The Construction and Completion of Structure Works for Kuala Terengganu Station (Package 2)
Project Location: Terengganu
Client: CCCC
Project Status: 05/02/2024 ~ ongoing

CCCC Base Camp

Project Details: Land area 42000 m², 38 Blocks, construction is inclusive of earthwork, building work, landscape, basketball court, carpark, water supply system, electrical system, etc.
Project Location: Kemaman, Terengganu
Client: CCCC
Project Status: 15/10/2017 ~ 31/1/2018

CCCC K38 Batching plant

Project Details: Land area 22000 m², 19 Blocks, construction is inclusive of earthwork, building work,
landscape, carpark, etc.
Project Location: Rawang,
Selangor
Client: CCCC
Project Status: 17/5/2022 ~ 9/11/2022

CCCC Fencing Installation

Project Details: Construction and Completion of Railside Protective Fencing from CH313+900 to CH336+417
Project Location: Kuantan, Pahang
Client: CCCC
Project Status: 07/02/2024 ~ ongoing

CCCC TBM excavated material handling

Project Details: Handling and Disposal of Tunnel Boring Machine (TBM) Excavated Material at Genting Tunnel (CH498+312)
Project Location: Bentong, Pahang
Client: CCCC
Project Status: 6/7/2022 ~ ongoing

CCCC BASE CAMP

Project Details: Land area 30000 m², 19 Blocks, construction is inclusive of earthwork, building work, etc.
Project Location: Bentong, Pahang
Client: CCCC
Project Status: 11/3/2022 ~ 11/7/2023

JOHOR ZONE 10 EARTHWORK

Project Details: Cadangan Melaksana Dan Menyiapkan Kerja Tanah, Sistem Kawalan Hakisan Tanah Dan Sedimentasi (Escp) Serta Lain-lain Kerja Berkaitan Di Zon 10, Kompleks Perindustrian Tanjung Langsat, Pasir Gudang, Johor Darul Ta’zim.
Project Location: Pasir Gudang, Johor
Client: TLD
Project Status: 03/01/2024 ~ ongoing

CCCC Earthwork

Project Details: The Construction and Completion of Subgrade Works from CH516+726.850 to CH516+955.000 and C2CH000+413.500 to C2CH000+606.000
Project Location: Gombak, Selangor
Client: CCCC
Project Status: 06/02/2024 ~ ongoing

CCCC DSM Piling works

Project Details: Construction of Deep Soil Mixing (DSM) Piling Works within the Railway Main Line and Spur Lines
Project Location: Kemaman, Terengganu/Kuantan, Pahang
Client: CCCC
Project Status: 1/8/2020 ~ ongoing

CCCC Earthwork

Project Details: Construction of Subgrade Earthwork for Kuantan Port City station from CH301+040 to CH301+825
Project Location: Kemaman, Terengganu /Kuantan, Pahang
Client: CCCC
Project Status: 20/6/2022~ ongoing

CCCC KT Station External Works

Project Details: The Construction and Completion of External Works for Kuala Terengganu Station  (Package 2)
Project Location: Terengganu
Client: CCCC
Project Status: 09/02/2024 ~ ongoing

CCCC Precast
Component

Project Details: The Construction and Completion of Precast Works for Power Cable Trough, Side Ditch and other Components
Project Location: Bentong, Pahang
Client: CCCC
Project Status : 15/12/2023 ~ ongoing

CCCC Box Culvert

Project Details: Construction of Subgrade Earthworks and Culvert Works from CH238+322 to CH241+460 and from CH244+747 to CH248+539
Project Location: Kemaman, Terengganu
Client: CCCC
Project Status: 1/4/2022 ~5/3/2023

CCCC Precast Component

Project Details: The Construction of Railside Drain and Cable Trough Prefabrication Works from CH272+700 to CH313+900 (Package B)
Project Location: Kemaman, Terengganu
Client: CCCC
Project Status: 15/8/2022 ~ ongoing

CCCC Surface Grouting

Project Details: Construction of Surface Grouting Works at Bentong Tunnel 3 (CH482+290 to CH482+400)
Project Location: Bentong, Pahang
Client: CCCC
Project Status: 6/7/2022~ 15/10/2022

CCCC KUANTAN BASE CAMP

Project Details: Land area 45000 m², 27 Blocks, construction is inclusive of earthwork, building work, landscape, basketball court, carpark, tunnel simulator, water supply system, electrical system, etc.
Project Location: Kuantan, Pahang
Client: CCCC
Project Status: 1/7/2020 ~ 27/10/2021

CCCC No.2 Batching Plant

Project Details: Construction of Temporary Work for Batching Plant no.2, it’s inclusive of concrete work, weighbridge, internal power supply, water supply, etc.
Project Location: Bentong, Pahang
Client: CCCC
Project Status: 3/9/2022 ~ 18/01/2023